Bengaluru tests simultaneous runway departures ahead of next week’s launch

0
  • Kempegowda International Airport tested simultaneous departures from both parallel runways on 20 November.
  • The airport plans a launch around 27 November 2026.
  • The trial used both parallel runways for departures.
  • The test preceded the planned operational launch.
  • The airport retained the planned launch date around 27 November.

Kempegowda International Airport has tested simultaneous departures from both parallel runways on 20 November ahead of a planned launch around 27 November. The trial covered departures from both parallel runways. The airport retained the planned launch date around 27 November 2026.

The test took place on 20 November. The airport planned the operational launch around 27 November 2026. The trial used both parallel runways for departures.

The airport retained the planned launch timeline. The test preceded the planned operational launch. The airport planned the launch around 27 November 2026.

Share.

Comments are closed.